User Tools

Site Tools


kit:assembly_outline

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
kit:assembly_outline [2017/01/11 22:17] – [Build It!] stevekit:assembly_outline [2017/01/14 15:20] – [Gather Parts & Supplies] steve
Line 78: Line 78:
  
   - FIXME - Steps!   - FIXME - Steps!
 +
 +===== Coin Slide sub-assembly =====
 +The **Coin Slide** is an acrylic ramp that catches coins from the **funnel** and transmits them to the inside of the Crowbox for storage. The **coin slide** features a network of thin copper wires which also electronically detect the metal coin as it slides into the Crowbox for storage.
 +
 +
 +==== Gather Parts & Supplies ====
 +  * Coin slide x1
 +  * Coin slide side rails x2
 +  * 24 gauge bare copper wires. 7x12 inch lengths
 +  * 3M self-adhesive noise dampening mat
 +  * Plastic cement
 +==== Build it! ====
 +  - Peel all protective paper from all acrylic parts
 +  - Cement side rails to coin slide
 +  - Attach and trim sound dampening material
 +  - Weave the wires
  
 ===== Rail sub-assemblies ===== ===== Rail sub-assemblies =====
kit/assembly_outline.txt · Last modified: 2018/08/01 13:37 by 127.0.0.1