kit:faq
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
kit:faq [2023/02/06 02:21] – admin | kit:faq [2023/02/06 02:23] – admin | ||
---|---|---|---|
Line 9: | Line 9: | ||
**Q: What does the CrowBox cost?** | **Q: What does the CrowBox cost?** | ||
- | A: We've tried to keep the cost of all materials as low as possible. Depending on where you source your materials, how expensive shipping is, and if you're able to get bulk materials in smaller lots, it should cost between $1-300 | + | A: We've tried to keep the cost of all materials as low as possible. Depending on where you source your materials, how expensive shipping is, and if you're able to get bulk materials in smaller lots, it should cost between $2-300 |
**Q: How long does it take to assemble the CrowBox?** | **Q: How long does it take to assemble the CrowBox?** | ||
A: This depends a lot on your experience and materials. We estimate about ten hours of work (split over a few days to allow parts to dry, etc.) | A: This depends a lot on your experience and materials. We estimate about ten hours of work (split over a few days to allow parts to dry, etc.) |
kit/faq.txt · Last modified: 2023/11/29 07:28 by admin